[Construction Case] Logistics Center: Floor Leveling Work for Concrete Slab
Forklift operation is possible immediately after construction completion! The unevenness caused by the earthquake has been corrected in a short period.
Here is an example of "floor level adjustment work" carried out at a logistics center in Kumamoto Prefecture. Due to the impact of the Kumamoto earthquake, floor subsidence occurred. This subsidence caused a height difference, making it difficult for forklifts to operate for transporting goods. Using two trucks loaded with Upcon equipment, we swiftly corrected the subsidence. Immediately after the completion of the work, forklift operation became possible. 【Case Overview】 ■ Construction Area: Approximately 1798.5m2 ■ Maximum Subsidence: 107mm ■ Area: Logistics center in Kumamoto Prefecture ■ Construction Period: 6 days *For more details, please refer to the PDF document or feel free to contact us.